Certificate in 72 hours
Once your lateral passes the EBMUD test, your certificate is in hand within three days.
Trenchless sewer lateral replacement and sidewalk certificates for Oakland, Berkeley and the East Bay, planned around your closing date so escrow never waits on a pipe.
Once your lateral passes the EBMUD test, your certificate is in hand within three days.
We finish before closing, so you skip the Time Extension Certificate and its deposit.
A clear, written quote fast, so you can plan your sale with real numbers.
We pull a new pipe through the old one from small access points, not a long trench.
If you own property in Oakland, Berkeley, Alameda, Emeryville, Piedmont, Albany, El Cerrito, Richmond or Kensington, the East Bay Municipal Utility District (EBMUD) requires a working sewer lateral. Proof is a compliance certificate, and three events trigger the requirement:
The most common reason. Escrow needs the certificate, or a costly deposit, to close.
Larger renovations must bring the sewer lateral up to standard.
A bigger or smaller meter also triggers the inspection.
Read the full EBMUD ordinance (PDF, opens in a new tab) · Learn more about sewer laterals
You always know what happens next, and when.
We inspect the lateral and send a clear, written quote.
Within 1 business dayWe book the work around your close of escrow date and handle the permits.
Planned around your COEWe replace the line trenchless, then pass the EBMUD verification test with an inspector on site.
Usually 1 to 2 daysYour EBMUD compliance certificate goes to you, your agent and escrow.
Within 72 hours
Inspection, repair or replacement, the EBMUD verification test and your certificate, all handled for you.
Learn about the EBMUD certificate →A new, seamless pipe pulled through the old one. Less digging, less mess, and a faster finish.
How trenchless works →
Required at title transfer in Oakland. We inspect, repair if needed, and file your Certificate of Compliance.
Learn about the sidewalk certificate →Average rating from 68 reviews on Yelp
Send us the property address and your close date. We'll take it from there and keep everyone posted.
Property owners in the EBMUD program area need one when they sell or transfer the property, pull a building or remodel permit over $100,000, or change their water meter size.
Your certificate is delivered within 72 hours of passing the EBMUD verification test. We schedule the work around your close of escrow so it arrives in time.
No. That deposit is only for a Time Extension Certificate, when the work isn't done by closing. We finish before closing, so you don't need it.
We use trenchless replacement. A new pipe is pulled through the old one from small access points, so there's no long trench across your yard.
It depends on the length and depth of your lateral, access, and your city's rules. Your free estimate is a clear, written quote, with no surprises.
A certificate for a fully replaced sewer lateral is valid for 20 years. Keep it for any future sale, large remodel or water meter change.
Yes. Oakland requires a sidewalk certificate at title transfer. We inspect, repair if needed, and file it. Learn more about sidewalk certificates.
Tell us about the property. We reply within one business day with a clear, written quote, and we plan the work around your closing date.
| Monday - Friday | 8:00 am - 5:00 pm |
| Saturday - Sunday | Closed |
Free estimate within one business day. No $4,500 EBMUD deposit.